Hydrosys is an engineering group dedicated to the hydropower and hydraulic structures industry, primarily in Canada and throughout the world.

ame-centrale-map

Honduras

San Pedro Sula

RIO GRANDE SIALE HYDROPOWER PROJECTS

25 MW and 8 MW hydropower projects on the Grande and Siale Rivers.

Prefeasibility studies.

map-crountry-land

Canada

Ontario

TRAMORE DAM

Concrete dam with weir and spillway.

Evaluation of dam security and authorization demands to carry out dam rehabilitation. Preparation of conceptual plans for the dam rehabilitation.

map-crountry-land

Canada

Québec

LAC DAWSON DAM

Weir dam made of wood cribs filled with rocks.

Dam safety assessment.

map-crountry-land

Canada

Québec

PENMAN DAM

Weir Dam, including a old powerhouse intake section, leveling of the crest of the dam. Height 8 m, length 30 m.

Weir stability study; detailed structural inspections and analysis of the shore wall, dams modifications, approvals under the provincial Dam Safety legislation.

map-crountry-land

Canada

Québec

HYDRO-FRASER HYDROPOWER PROJECT

The Hydro-Fraser hydropower project is a privately-owned site producing electricity on Hydro-Québec’s network since 1992. This facility is located in the Fraser pulp mill’s old building and was using the Fraser mill’s old wooden crib dam, its water intake and its 10’ wooden penstock. These infrastructures needed to be restored in order to ensure the continuity of the facility and to meet the renewable contract conditions for selling energy onto Hydro-Québec grid.

See the project >>
map-crountry-land

Canada

Québec

SAINT-BRUNO DAMS

Six retaining structures to control three water reservoirs belonging to the municipality.

Statutory inspections of six structures and strategic evaluations of necessary actions to be taken to carry out their rehabilitation of demolition.

map-crountry-land

Canada

Québec

ÉNERGIE SHANNON POWER

3.5 MW hydropower project.

Feasibility study and preliminary design for EA purposes and permit application. Plans and specifications for construction.

map-crountry-land

Canada

Ontario

MACLOED-MOSHER MINE

This project consisted of preparing drawings and specifications for a rockfill dam with a height of 3.5 m and an emergency overflow weir used in the retention of pumped water coming from an old existing mine near the village of Geralton, 2 hours north-east of Thunder Bay. Le project also includes the design of a second rockfill closing-dyke and three energy-dissipating berms.

See the project >>
map-crountry-land

Canada

Ontario

TRAMORE DAM

Concrete dam with weir and spillway.

Evaluation of dam security and authorization demands to carry out dam rehabilitation. Preparation of conceptual plans for the dam rehabilitation.

map-crountry-land

Canada

Ontario

FIRST CHUTE HYDROPOWER PROJECT

1,200 kW hydropower project on the Bonnechere River.

Feasibility analysis and environmental assessment study; Engineering Summary Report.

map-crountry-land

Canada

Québec

DAM SAFETY ASSESSMENT CHUTES-À-MAGNAN DAM

Dam safety assessment for the Chutes-à-Magnan dam located on Du Loup River, in the town of Saint-Paulin. This assessment is being done in accordance with the Dam Safety Act (LSB, 2000, c.9) (L.R.Q, chapter S-3.1.01).

The dam includes a spillway, a water intake and abutment walls. The small hydro power plant generates 8 MW.

See the project >>
map-crountry-land

Canada

Québec

DAM SAFETY ASSESSMENT CHAUDIÈRE FALL DAM

Dam safety assessment for Chaudière Falls Dam, located on the Chaudière River, in the town of Lévis, near Québec. This assessment is being conducted in accordance with the Dam safety regulation (LSB, 2000, c.9) (L.R.Q., chapter S-3.1.01).

The dam includes a spillway, a water intake and partitions. The small hydro power plant generates 25 MW.

See the project >>
map-crountry-land

Canada

Ontario

DAM SAFETY ASSESSMENT MIDDLE DURHAM DAM

Dam safety assessment of Middle Durham dam, located in the town of Durham in the West Grey Municipality. This study was completed in accordance with Ontario’s regulations pertaining to the dam security: 1999 Ontario Dam Safety Guidelines (ODSG) draft document, Lakes and Rivers Improvement Act Technical Guide – Criteria and Standards for Approval”.

See the project >>
map-crountry-land

Canada

Québec

PORTNEUF RIVER HYDROELECTRIC INSTALLATIONS

Innergex hired Hydrosys to perform a dam safety evaluation of three of their dams located on Portneuf River, more specifically the dams PN1, PN2 and PN3. An inspection of the three dams was done in 2008, after which studies of the dams’ hydrology, hydraulics and stability were performed in 2009. These studies examined the risk presented by the dams to the adjacent infrastructures, including the risk posed by successive dam failures of all three dams. The installation includes four weirs, two intakes, four enclosure dikes and three small hydoelectric stations which produce a total of 28 MW.

See the project >>
map-crountry-land

Canada

Québec

MONTMAGNY DAM

Safety assessment of the Montmagny dam, located on the South River in the municipality of Montmagny. The study was realised in accordance with the laws included in the Dam Safety Act (LSB, 2000, c.9) (L.R.Q, chapter S-3.1.01).

The dam includes a weir, a water intake, a bypass channel and a hydroelectric generating station producing 2.1 MW.

See the project >>
map-crountry-land

Canada

Ontario

3 DAMS ON THE SOUTH NATION RIVER

Dam safety assessment for the Chesterville, Crysler and Plantagenet dams located on the South Nation river in the municipalities of Chesterville, Crysler and Plantagenet, south-east of Ottawa. This study was realised in conjunction with the laws present in the Lakes and River Improvement Act and its Technical Bulletins (2011).

The structures that were under evaluation included a dam composed of five sluices, an overflow dam equipped with a two-sluice flood evacuator and second overflow dam.

See the project >>
map-crountry-land

Canada

Ontario

WASDELL FALLS HYDROPOWER PROJECT

The Wasdell Falls project consists of retrofitting the existing dam owned by Ontario’s Department of Natural Resources in order to build a small, 2 MW hydroelectric powerplant. Three VLH (very low head) type turbines are to be installed on the left shore of the dam. A sluice bay of the existing dam structure was also modified in order to install a fourth turbine unit powering the reserved flows going through the bypass reach.

See the project >>
ame-centrale-map

Nicaragua

Rio Mico

EL CONSUELO AND PIEDRA PUNTUDA HYDROPOWER PROJECTS

HEMCO Nicaragua S.A. mandated Hydrosys to perform the engineering of the EL Consuelo and the Piedra Puntuda hydroelectric projects in Nicaragua. These projects, currently in their prefeasibility stage, were developed to provide hydroelectricity for the industrial and domestic markets at competitive and stable costs, significantly lower than those achieved through fossil fuels. Both projects are designed as close coupled arrangement at low head that deliver about 12 MW and 8 MW of green energy.

See the project >>
map-crountry-land

Canada

Québec

HYDROPOWER PROJECT CHUTE-À-THOMPSON

The hydroelectric project of Chute-à-Thompson has a 10 MW power capacity and is located near Baie-Comeau (Québec). The project involves the construction of a concrete dam, a spillway, a cofferdam, an intake structure and adjacent embankment dams.

See the project >>
map-crountry-land

Canada

Québec

SHELDRAKE HYDROPOWER PROJECT

The Sheldrake hydroelectric installation has a 25 MW power capacity and is located on the Sheldrake river in the town of Rivière-au-Tonnerre in Minganie, near Baie-Comeau (Québec). The project consists of building a concrete dam-bridge, a spillway, a cofferdam, the water intake, a pressure tunnel with a steel liner and the power plant.

See the project >>
europe-centrale-map

France

Nentilla

REFURBESHING OF A PENSTOCK NENTILLA HYDROELECTRIC STATION

The demolition, design and replacement of a 395 m long penstock with a diameter of 1.6 m and located in a mountainous region. The same tasks were also applicable to the conduit’s support system, composed of five concrete massifs (primary supports) and 70 smaller concrete blocks (secondary supports). In all, the entire rugged section was replaced and the smooth section was treated.

See the project >>
map-crountry-land

Canada

Québec

REDMOND MINE PIT 1

Preliminary drawings and specifications of a rockfill dam with a height of 5 m and an emergency overflow weir used to close-off the existing open-air mine converted into a retention basin near the city of Shefferville, close to the border of Labrador, in the north-east of Quebec.

See the project >>
ame-centrale-map

Amérique centrale

Rio Gualcarque

RIO GUALCARQUE HYDROPOWER PROJECT

Rio Power S.A. mandated Hydrosys to perform the engineering of the Rio Gualcarque Waterpower Project in Honduras. The project will provide hydroelectric power for industrial and domestic markets at competitive and stable costs, significantly lower than those achieved through fossil fuels. The project includes the construction of a ±40 m high dam and a 5 km long penstock which will reach the powerhouse located 180 meters lower. The first phase will generate approximately 20 MW of green energy and a second phase could be added to the project to provide another 5 MW. Topographic surveying began in November 2009 and further engineering has followed in 2010. Project development has been successfully completed, land leases and acquisition as well as social and environmental licensing, further hydrology studies, geotechnical investigation work and cost estimations should be completed in 2013-2014 along with the financing agreements. Construction is planned to begin in 2015.

See the project >>
map-crountry-land

Canada

Ontario

HYDROELECTRIC INSTALLATION THOMAS LOW

This project consists of an upgrade to the site’s hydropower production capacity and the construction of a new facility as well as the rehabilitation of existing components. The new 4 MW power plant requires the construction of a new water intake, a new penstock and a new power plant. The two existing power plants will be decommissioned and the new facility will provide an increase in the overall capacity while bypassing both existing structures with the help of a new penstock and by reusing the rehabilitated dam and headrace.

See the project >>
map-crountry-land

Canada

Ontario

DOUGLAS FALLS HYDROPOWER PROJECT

Multistream Power Corporation hired Hydrosys to build a new powerhouse to maximize the site’s hydroelectric potential. The project consisted of modifying the existing dam, of demolishing the existing powerhouse and building a new larger plant able to accommodate six new Kaplan Vertical Saxo-type turbines capable of generating 1.8 MW of electricity. Also included in this project was the construction of an improved tailrace channel and a diversion wall to mitigate the potential environmental impacts of changing the downstream water flow patterns.

See the project >>
map-crountry-land

Canada

Québec

SOUTH RIVER HYDROPOWER PROJECT

This project consisted of the construction of a small 880 kW hydropower plant with a 20 m head. It included the partial demolition of the existing power plant and the construction of access roads, the water intake, the headrace canal, a fore bay pit, the penstock and the new power plant located on the old structure’s existing foundation.

See the project >>
map-crountry-land

Canada

Ontario

ENERDU HYDROPOWER PROJECT

1 MW hydropower project.

Feasibility study and preliminary design for EA purposes and permit application. Plans and specifications for construction.

Evaluation of dam security and authorization demands to carry out dam rehabilitation. Preparation of conceptual plans for the dam rehabilitation.

map-crountry-land

Canada

Ontario

LIZARD CREEK HYDROPOWER PROJECT

1 MW hydropower project.Design optimization.

Detailed engineering of the dam, spillway, earthfill dike, intake, penstock powerhouse and tailrace canal.


PECORS

2 MW hydropower project.

Design optimization. Preliminary and detailed engineering of the dam, spillway, earthfill dike, intake, penstock powerhouse and tailrace canal.

map-crountry-land

Canada

Ontario

TEDDY'S FALL HYDROPOWER PROJECT

4 MW hydropower project.

Preliminary design and optimization for EA purposes and permit application.

map-crountry-land

Canada

Ontario

STINSON HYDROPOWER PROJECT

5 MW hydropower project.

Detailed civil, mechanical and electrical inspection and plant facility condition assessment report.

map-crountry-land

Canada

Baie James

OUJÉ-BOUGOUMOU HYDROPOWER PROJECT

Evaluation of hydropower project alternatives (900 kW and 9,000 kW).

Feasibility study, evaluation of alternatives, environmental assessment and public consultation.

map-crountry-land

Canada

Mauricie

MATAWIN DAM

Water regulation structure, height 27 m. Modification of dam to incorporate a 15 MW hydropower project.

Stability study of the modified section of the dam regulator. Performance specifications for dam modification and demolition. Approvals under the provincial Dam Safety legislation.

ame-centrale-map

Honduras

San Pedro Zacapa

CANJEL HYDROPOWER PROJECT

2.5 MW hydropower project.

Detailed engineering, regulatory authorizations and permits approval process, plans and specifications for the construction, supervision and management of the construction and commissionning.

ame-centrale-map

Honduras

Comayagua

HUMUYA HYDROPOWER PROJECT

10 MW hydropower project.

Detailed engineering, regulatory authorizations and permits approval process, plans and specifications for the construction, supervision and management of the construction and commissionning.

ame-centrale-map

Panama

Coclecito

COCLECITO HYDROPOWER PROJECT

1,300 kW hydropower project.

Feasibility analysis, environmental study and preliminary design for construction.

map-crountry-land

Canada

Ontario

PECORS HYDROPOWER PROJECT

2 MW hydropower project.

Design optimization. Preliminary and detailed engineering of the dam, spillway, earthfill dike, intake, penstock powerhouse and tailrace canal.

map-crountry-land

Canada

Ontario

TWIN FALLS HYDROPOWER PROJECT

5 MW hydropower project on the Namewaminikan River.

Detailed project engineering and design optimization of the dam, cofferdams, spillway, intake, tunnel, powerhouse and tailrace canal.

map-crountry-land

Canada

Ontario

LONG RAPID HYDROPOWER PROJECT

5 MW hydropower project on the Namewaminikan River.

Detailed project engineering and design optimization of the dam, cofferdams, spillway, intake, tunnel, powerhouse and tailrace canal.

map-crountry-land

Canada

Québec

LAC FORTIN DAM

Weir dam made of wood with a length of 8 m and height of 1 m, equipped with a concrete spillway structure and steel gate.

Engineering for the demolition of existing structures and for the reconstruction of a concrete spillway with an energy dissipator and a fish pass as well as the preparation of the call for tenders documents.

map-crountry-land

Canada

Québec

RAWDON DAM

Hydroelectric installation with flood spillway, intake and wingwall.

Stabilisation of the intake by way of concrete reinforcement and stabilisation of the left wingwall by way of installation of post-tensioned anchors into the bedrock.

map-crountry-land

Canada

Québec

BELLETERRE HYDROPOWER SITE DAM

Main Dam, height 10 m, length 90 m.

Dam safety assessment. Cascade dam brake revision for the upstream regulation sections. Auxilary wood dams safety assessment.

map-crountry-land

Canada

Ontario

MNR SAFETY BOOM STUDY

12 water control structures in Bancroft District, Algonquin Park and Pembroke District.

Site inspections, planning and design to meet public health and safety guidelines at MNR owned dams. Design of safety boom siting, updated signage and management of Transport Canada approval process for dam registration and safety boom approvals.

map-crountry-land

Canada

Québec

CRYSLER DAM

Concrete regulation dam, height 4 m, length 100 m.

Detailed inspections and structural assessment of the downstream face of structure. Dimensional surveying in order to provide engineering drawings of recommended corrective measures.

map-crountry-land

Canada

Ontario

DAM #1

Bridge-Dam, water supply canal and intake for a 1 MW Small Hydro facility, height 9 m, length 236 m.

Dam safety assessment; specifications and drawings for dam rehabilitation.

map-crountry-land

Canada

Ontario

LATCHFORD DAM

Reconstruction of a concrete dam of height 6 m and length 107 m.

Premiliminary design, conceptual design and detailed engineering for the reconstruction of the regulating dam, with possibility of incorporating a small Hydro facilty.

DSC_4415 - Gang-341

Canada

Québec

MONTRÉAL OFFICE

DSC_4449 - DG+RO-341

Canada

Québec

BUREAU DE SHERBROOKE

niko_341x341

Canada

British Columbia

VANCOUVER OFFICE

map-crountry-land

Canada

Québec

JIM GRAY HYDROPOWER PROJECT

50 MW hydroelectric generating station on the Shipshaw River.

Periodic facility condition assessment report and life expectancy.

ame-centrale-map

Honduras

San Pedro Sula

BLUE ENERGY - SITE SCREENING

Preliminary assessment (screening) of 3 hydropower projects on 3 sites between Icatuyo, Zompopero and Canjel rivers for a total of ± 40 MW.

Screening and prefeasibility analysis of projects. On going support for PPA negotiations.

map-crountry-land

Canada

Ontario

EUGENIA HYDROPOWER PROJECT

6.5 MW hydropower project.

Detailed civil, mechanical and electrical inspection and plant facility condition assessment report.

map-crountry-land

Canada

Québec

PONT ARNAUD ET CHUTE GARNEAU HYDROPOWER PROJECTS

8 MW and 5.3 MW hydropower project on Chicoutimi River.

Technical owner engineering review of hydraulic and detailed civil engineering.

ame-centrale-map

Nicaragua

LA FLORIDA HYDROPOWER PROJECT

3 MW hydropower project.

Detailled engineering for the construction of the dam and Coanda intake for the project.

map-crountry-land

Canada

Ontario

NORLAND HYDROPOWER PROJECT

Small 500 kW hydropower project on the Trent Severn Waterway.

Preliminary engineering, cost estimate and support for the FIT program application in Ontario.

ame-centrale-map

Guatemala

SULIN HYDROPOWER PROJECT

23 MW hydropower project, 700 m of head in two phases.

Peer review of project structure, management and engineering. Construction monitoring and certification of progress for the CAMIF investment fund.

ame-centrale-map

Honduras

San Pedro Sula

RIO POWER - SITE SCREENING

Preliminary assessment (screening) of 3 hydropower projects from 5 to 20 MW on 3 sites between Gualcarque, Humuya and Marales rivers for a total of ± 35 MW.

Screening and prefeasibility analysis of projects. On going support for PPA negotiations.

map-crountry-land

Canada

Québec

ORICA DAM

Dam and intake, height 6.9 m, length 45 m.

Dam safety assessment; specifications, conceptual engineering and detailed design for dam rehabilitation.

map-crountry-land

Canada

Ontario

RUSSELL WEIR

Concrete regulation dam, height 3.2 m, length ±100 m, partially founded on soil.

Detailed inspection and structural assessment of the weir apron. Dimensional surveying for the completion of engineering drawings detailing recommended corrective measures.

map-crountry-land

Canada

Ontario

MCVITTIE GENERATING STATION

Dam including spillway and water intake structure for a 2 MW Small Hydro facility, height 7.7 m, length 125 m.

Stability study in accordance with the "Lakes and Rivers Improvement Act"; specifications and drawings for dam rehabilitation.

map-crountry-land

Canada

Québec

BAY LAKE DAM

Rebuilding of dam, height 4.5 m, length 70 m.

Technical and financial analysis for rebuilding options, and final design. Approvals under the provincial Dam Safety legislation; specifications and drawings for bids.